EPA approves CO2 permit for Texas steel maker; anyone notice?

June 19, 2014

Here’s the press release from EPA’s Region 6 office:

EPA Finalizes Greenhouse Gas Permit for Voestalpine Iron Production Plant
$740M facility in San Patricio Co., TX, will bring 1,400 construction jobs and150 permanent jobs

DALLAS – (June 16, 2014) The U.S. Environmental Protection Agency (EPA) has issued a final greenhouse gas (GHG) Prevention of Significant Deterioration (PSD) construction permit to Voestalpine for an iron production plant in San Patricio County, TX. The facility’s process for producing iron will use minimal natural gas and will be 40 percent more efficient than traditional methods. The permit is another in the series of permits drafted by the Texas Commission on Environmental Quality (TCEQ) and issued by EPA under a program to facilitate timely permitting for applicants in the State of Texas.

“Voestalpine shows energy efficiency is a common-sense strategy for success, not just in business but for the environment as well,” said Regional Administrator Ron Curry. “The joint EPA and TCEQ permitting program is helping Texas business grow while building greener plants.”

The plant will reduce iron ore pellets, which will be used as raw material input at steel mills. The direct reduced iron process will use only clean-burning natural gas instead of solid fossil fuels. The estimated project cost is $740 million and will bring 1,400 construction jobs to the area. Once complete, the facility will create around 150 permanent jobs.

In June 2010, EPA finalized national GHG regulations, which specify that beginning on January 2, 2011, projects that increase GHG emissions substantially will require an air permit.

EPA believes states are best equipped to run GHG air permitting programs. Texas is working to replace a federal implementation plan with its own state program, which will eliminate the need for businesses to seek air permits from EPA. This action will increase efficiency and allow for industry to continue to grow in Texas.

EPA has finalized 43 GHG permits in Texas, proposed an additional six permits, and currently has 21 additional GHG permit applications under review and permit development in Texas.

For all of the latest information on GHG permits in Texas please visit: http://yosemite.epa.gov/r6/Apermit.nsf/AirP

Connect with EPA Region 6:
On Facebook: https://www.facebook.com/eparegion6
On Twitter: https://twitter.com/EPAregion6
Activities in EPA Region 6: http://www.epa.gov/aboutepa/region6.htm

Headquarters of Voestalpine, head-turning building by Dietmar Feichtinger Architectes, located in Linz, Austria.  Architecture News Plus image

Headquarters of Voestalpine, head-turning building by Dietmar Feichtinger Architectes, located in Linz, Austria. Architecture News Plus image. Voestalpine plans to build a $740 million steel plant near Corpus Christi, Texas.

This is big news, really.  Texas constantly complains about regulations on greenhouse gases, and regularly and constantly sues EPA to stop regulation.  Texas and it’s wacky governor Rick Perry constantly complain that EPA regulation harms jobs, and that permits never really get issued.  So this announcement should be front page news in most Texas newspapers.

How was it covered?

That’s it for Texas media.  Where are the Dallas Morning News, the Fort Worth Star-Telegram, the Houston Chronicle, the San Antonio Express, the El Paso Times?  Big market TV and radio?

National coverage was limited to low-circulation newsletters.

Seems to me that these issues of actual action on climate change, are under-reported.

More:

Groundbreaking for Voestalpine facility near Corpus Christi, Texas

Caption from Voestalpine LLC: After about a year of preparation, Wolfgang Eder, CEO of voestalpine, broke ground today for the construction of a direct reduction plant in Texas (USA). This EUR 550 million investment is the largest foreign investment in the history of the Austrian Group. The voestalpine Texas LLC plant is being constructed at the La Quinta Trade Gateway Terminal in close proximity to the City of Corpus Christi. Starting in 2016, the plant will produce two million tons of HBI (Hot Briquetted Iron) and DRI (Direct Reduced Iron) annually and will supply Austrian locations, such as Linz and Donawitz, with “sponge iron” as a premium raw material. With the new facility, voestalpine can significantly reduce production costs in Europe. The highly automated plant will create 150 jobs.